Procurement and Installation of a Combined Cycle Unit with a net power of 550.2 MW in Lavrio
Client: METKA S.A.
Construction Period: 1997-1999
Subject of contract:
- Erection-assembly of a 460-ton steel building.
- Erection-assembly of a G.T.A. chimney steel base weighing 65 tons.
- Erection-assembly of a 370-ton Boiler A pylon.
- Erection-assembly of the external casing of the G.T.A. chimney weighing 190 tons
- Preparation-erection-assembly of boiler cones A, B, & C at +26.9 to +36 meters, weighing 27 tons/cone.
- Erection and full assembly of the dampers, blowers, motors and vertical pre-assembled sections of the Boiler A, B, & C chimneys.
- Pre-assembly-erection and full installation of the Steam Turbine Hall weighing 1,600 tons.
- Pipe Rack with a total weight of 300 tons.
- Portal Crane weighing 300 tons (for the erection of the generator).
CONTACT
Kaslas Industrial Area, Kozani 501 00 | |
info@mekate.gr | |
+30 2461021071 |