Procurement and Installation of a Combined Cycle Unit with a net power of 550.2 MW in Lavrio


Client: METKA S.A.
Construction Period: 1997-1999

Subject of contract:

  • Erection-assembly of a 460-ton steel building.
  • Erection-assembly of a G.T.A. chimney steel base weighing 65 tons.
  • Erection-assembly of a 370-ton Boiler A pylon.
  • Erection-assembly of the external casing of the G.T.A. chimney weighing 190 tons
  • Preparation-erection-assembly of boiler cones A, B, & C at +26.9 to +36 meters, weighing 27 tons/cone.
  • Erection and full assembly of the dampers, blowers, motors and vertical pre-assembled sections of the Boiler A, B, & C chimneys.
  • Pre-assembly-erection and full installation of the Steam Turbine Hall weighing 1,600 tons.
  • Pipe Rack with a total weight of 300 tons.
  • Portal Crane weighing 300 tons (for the erection of the generator).